Permit: T10BU00878

Parcel: 11942006E


Addresses:

4455 S MISSION RD

Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Date Description Inspector Results Comments
08/20/2012 GRADING - INTERMEDIATE Approved
03/16/2012 GRADING - INTERMEDIATE Continued GOT WITH JOHN ABOUT COMPLETING ALL WORK BEFORE FINAL.
02/09/2012 GRADING - INTERMEDIATE Continued PARKING LOT ON NORTH WEST SIDE NOT COMPLET. NO WORK HAS BEEN DONEON BASINS.
01/30/2012 GRADING - INTERMEDIATE Continued NO ONE WORKING ON BASIN OR OUT SIDE OF BUILDING .
01/20/2012 GRADING - INTERMEDIATE Continued NO OUT SIDE ACTIVITY AT THIS TIME.
01/13/2012 GRADING - INTERMEDIATE Continued WORKING ON BASINS AND CLEANING DRAINAGE ON EAST SIDE OF JOB SITE.
12/20/2011 GRADING - INTERMEDIATE Continued NO GRADING ACTIVITY AT THIS TIME.
12/14/2011 GRADING - INTERMEDIATE Continued STANDING WATER IN BASINS. CONTRACTOR HAS NOT ADDRESSED ROOF DRAINS RUNNING OVER SIDEWALK AREA AT BULDING #3.
12/07/2011 GRADING - INTERMEDIATE Closed NO WORK BEING DONE OUT SIDE OF THE BUILDING.
12/02/2011 GRADING - INTERMEDIATE Approved
11/10/2011 GRADING - INTERMEDIATE Continued
11/04/2011 GRADING - INTERMEDIATE Continued INSTALLING SOD ON THE SOCCER FIELD.
11/01/2011 GRADING - INTERMEDIATE Continued GOT WITH JONH TO GET AREA READLY FOR INSPECTION NOT ALL AT ONCE.
10/25/2011 GRADING - INTERMEDIATE Continued WORKING IN MIDDEL OF BUILDINGS #6 AND #7
10/24/2011 GRADING - INTERMEDIATE Continued ONLY WORKING GRADING ON SOUTH SIDE OF JOB SITE.
10/20/2011 GRADING - INTERMEDIATE Continued NO GRADING ACTIVITY AT THIS TIME.
10/13/2011 GRADING - INTERMEDIATE Continued WORKING ON AREA CENTER OF BUILDING #5&#6.
10/07/2011 GRADING - INTERMEDIATE Continued NO GRADING WORK AT THIS TIME.
10/05/2011 GRADING - INTERMEDIATE Continued NO GRADING ACTIVITY AT THIS TIME.
09/28/2011 GRADING - INTERMEDIATE Continued WALK THUR JOB SITE WITH DAVE.
09/27/2011 GRADING - INTERMEDIATE Continued NO CONCERNS AT THIS TIME.
09/26/2011 GRADING - INTERMEDIATE Continued NO CONCERNS AT THIS TIMES.
09/23/2011 GRADING - INTERMEDIATE Continued SOME GRADING WORK BETWEEN BUILDING #3&#4 FOR LANDSCAPING.
09/22/2011 GRADING - INTERMEDIATE Continued GRADING WORK BEING DONE IN BACK OF BUILDING #5.
09/21/2011 GRADING - INTERMEDIATE Continued WORKING ON SCUPPERS ON WEST SIDE OF BUILDING #2.
09/19/2011 GRADING - INTERMEDIATE Continued NO CHANGES FROM LAST INSPECTION.
09/15/2011 GRADING - INTERMEDIATE Continued NO CHANGES FROM LAST INSPECTION.
09/01/2011 GRADING - INTERMEDIATE Continued WORKING ON DRAINAGE ON WEST SIDE OF PARKING AREA.
08/29/2011 GRADING - INTERMEDIATE Continued NO GARDING WORK TODAY.
08/18/2011 GRADING - INTERMEDIATE Continued EAST SIDE DRIVE READY FOR PAVING.
08/17/2011 GRADING - INTERMEDIATE Continued GRADING WORK BEING DONE ON EAST SIDE DRIVE.
08/16/2011 GRADING - INTERMEDIATE Continued SOUTH OF WEST SIDE PARKING AREA OK ONLY. TEMP COF O OK PER RON BOOSE FOR BUILDINGS #1,#2&#3,#4 ONLY ALL FEES FOR TEMP COFO AND AFTER HOURS INSPECTIONS TO BE PAID AT 201 N STONE.
08/11/2011 GRADING - INTERMEDIATE Denied WENT OVER TEMP PLAN FOR BUILING #1 #2 #4 #5
08/10/2011 GRADING - INTERMEDIATE Continued WORKING ON CLEANING PARKING AREA TO START STRIPING.
08/02/2011 GRADING - INTERMEDIATE Continued WALK TUR WITH JIM FOR TEMP C OF O ON WHAT NEEDS TO BE DONE . BEN GAVE ME A PLAN ON WHAT HES GOING TO DO FOR TEMP C OF O.
07/28/2011 GRADING - INTERMEDIATE Continued WORKING ON SIDE WALK ON WEST SIDE OF BUILDING.
07/20/2011 GRADING - INTERMEDIATE Continued NO GRADING ACTIVITY.
07/18/2011 GRADING - INTERMEDIATE Continued NO CONCERNS AT THIS TIME.
06/24/2011 GRADING - INTERMEDIATE Continued WALK THRU JOB SITE WIHT JOHN AND PULLED MEASUREMENTS ON SITE. AND WHENT OVER SOME AREAS ON THE JOB THAT NEEDED CLEANED UP AND TO STAY ON CLEANING TRACK OUT.
06/15/2011 GRADING - INTERMEDIATE Continued GOT WITH BEN & JOHN ABOUT TRACK OUT AND WSAH OUT.
06/10/2011 GRADING - INTERMEDIATE Continued GRADING WORK ON NORTH SIDE OF PROJECT.
05/16/2011 GRADING - INTERMEDIATE Continued WORKING ON SIDEWALKS.
05/11/2011 GRADING - INTERMEDIATE Continued INSTALLING CURBING ON WEST SIDE OF PROJECT PER SD 209
05/10/2011 GRADING - INTERMEDIATE Continued NO TRACK OUT AT THIS TIME.WORKING ON CRUBING ON WEST SIDE OF PROJECT.
05/06/2011 GRADING - INTERMEDIATE Continued SWPPP OK .STARTING GRADING WORK ON WEST SIDE OF BUILDING.
05/02/2011 GRADING - INTERMEDIATE Continued WORKING ON SIDE WALK ON EAST SIDE OF BUILDING #5.
04/14/2011 GRADING - INTERMEDIATE Continued responded to complaint received from transportation regarding removal of vegetation on site. I found out that work is being done in the Pima Co. ROW for a new median and they have remmoved ROW vegetation. I called transportation back and let them know it is PIma Co. work.
03/14/2011 GRADING - INTERMEDIATE Continued NO GRADING BEING DONE AT THIS TIME.
02/23/2011 GRADING - INTERMEDIATE Partial Approval TALK WITH CONTRACTOR ON START OF GRADING.HE SAID ABOUT END OF MARCH.
02/01/2011 GRADING - INTERMEDIATE Continued Contractor placing 18" RCP between bldg 4 and 5, OK to backfill. Also forming base for MH between Bldg 4 & 5.
01/31/2011 GRADING - INTERMEDIATE Continued OK to backfill 18" SRP from outlet to first MH between Bldg 4 and 5.