Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T10BU00878

Parcel: 11942006E


Addresses:

4455 S MISSION RD

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
11/10/2011 STORMWATER FOLLOW-UP INSP Approved
10/13/2011 STORMWATER FOLLOW-UP INSP Continued JAYS REPORT ON SITE.
09/20/2011 STORMWATER FOLLOW-UP INSP Continued JAY WORK ING ON REPAIRS TO SWPP ON WEST SIDE .
09/13/2011 STORMWATER FOLLOW-UP INSP Continued GOT WITH O'LEARY ON TACK-OUT CLEAN UP.
09/09/2011 STORMWATER FOLLOW-UP INSP Continued GOT WITH JAY ON REPAIRING SWPPP CONTROLS.
09/09/2011 STORMWATER FOLLOW-UP INSP Continued JAY REPAIRED SWPPP CONTROLS ON WEST SIDE OF JOB SITE.
09/07/2011 STORMWATER FOLLOW-UP INSP Continued GOT WITH O' LEARY ABOUT CLEANING STREETS AND REPAIRING SWPP CONTROLS.
08/30/2011 STORMWATER FOLLOW-UP INSP Continued GOT WITH JOHN TO REPAIR SWPP CONTROLS.
08/18/2011 STORMWATER FOLLOW-UP INSP Continued REINSTALL SWPPP CONTROLS THAT VARE DOWN WENT OVER WITH JOHN.
08/03/2011 STORMWATER FOLLOW-UP INSP Continued GOT WITH JAY ABOUT SWPP CONTOLS.
07/27/2011 STORMWATER FOLLOW-UP INSP Continued JAY WORKING ON SWPPP CONTOLS.
07/26/2011 STORMWATER FOLLOW-UP INSP Continued STREETS LOOK OK AFTER RAIN THIS WEEKEND.
07/11/2011 STORMWATER FOLLOW-UP INSP Continued STREETS LOOK A LOT BETTER . WASHOUT LOOKS GOOD GOT WITH LARRY TO CALL BACK FOR GRADING INSPECTION.
07/08/2011 STORMWATER FOLLOW-UP INSP Continued TRACK OUT HAS BEEN CLEANED UP.
07/07/2011 STORMWATER FOLLOW-UP INSP Continued WALKED STREET WITH LARRY KUTZ FROM SUNT STREET NEEDS TO BE SWEAP .
07/06/2011 STORMWATER FOLLOW-UP INSP Continued JOB SITE AND STREET LOOKS MUCH BETTER.
05/20/2011 STORMWATER FOLLOW-UP INSP Continued NO CONCERNS AT THIS TIME. BEN WORKING ON A SMALL SET OF AP PLANS.
05/13/2011 STORMWATER FOLLOW-UP INSP Continued GOT WITH BEN ABOUT TRACK OUT ON SOUTHWEST SIDEOF PROJECT. CURB AND SIDEWALK WORK GONIG ON.
04/25/2011 STORMWATER FOLLOW-UP INSP Continued SWPPP OK AT THIS TIME.
04/14/2011 STORMWATER FOLLOW-UP INSP Continued Swppp OK at this time.
04/08/2011 STORMWATER FOLLOW-UP INSP Continued SWPPP OK AT THIS TIME.
04/04/2011 STORMWATER FOLLOW-UP INSP Continued SWPPP OK AT THIS TIME.
03/30/2011 STORMWATER FOLLOW-UP INSP Continued TALK WITH BEN FROM SUNDT TO CLEAN TRASH AND REPAIR SWPPP CONTROLS AND CLEAN WASH OUT.
03/21/2011 STORMWATER FOLLOW-UP INSP Continued NO CONCERNS AT THIS TIME.
03/14/2011 STORMWATER FOLLOW-UP INSP Continued SWPPP OK AT THIS TIME.
03/02/2011 STORMWATER FOLLOW-UP INSP Continued remone all trash from east side of project swppp and maintain all swpp per swppp plan.
02/23/2011 STORMWATER FOLLOW-UP INSP Partial Approval WALK THRU WITH CONTRACTOR FOR ON SITE SWPPP
01/31/2011 STORMWATER FOLLOW-UP INSP Correction Required Contractor had main gate where rock construction entrance is located closed today, so vehicle were using an entrance without rock. Told contractor that he needed to open main entrance.
10/21/2010 STORMWATER FOLLOW-UP INSP Correction Required METAL GRATES HAVE BEEN PLACE ALONG WITH STABILIZED CONST. ENTRANCE. HAS MINIMIZED TRACK-OUT. HAULING WILL CONTINUE TOMORROW.
10/19/2010 STORMWATER FOLLOW-UP INSP Correction Required MET WITH BEN--REINFORCED ENTRANCE. TRUCKS ARE BYPASSING ROCK AND TRACKING DIRT ON VIA INGRESSO TO MISSION. SWEEPER IS JUST MOVING DIRT AROUND. NEED TO FIND DIFFERENT SOLUTION. PER BEN TRUCKS WILL NOT CONTINUE HAULING TILL ISSUE IS RESOVED.
10/18/2010 STORMWATER FOLLOW-UP INSP Correction Required MET WITH BEN AND REP FROM O'LEARY RE: TRACK-OUT ON MISSION.
10/15/2010 STORMWATER FOLLOW-UP INSP Correction Required PER J. FEMLING. RECEIVED COMPLAINT REGARDING TRACK-OUT ON MISSION ROAD. WAS ON SITE APPROX. 3:30 PM. STREET SWEEPER WAS WORKING ON VIA INGRESSO WORKERS WERE USING HIGH-PRESSURE HOSE FROM WATER TRUCK TO SPRAY DOWN STREET AHEAD OF SWEEPER. WORKERS DISCONTINUED USE OF PRESSURE HOSE. I CONTACTED BEN TECHEYA SITE SUPV. REGARDING CONCERNS ON SITE. WILL HAVE A SITE MEETING WITH HIM AND SWWP PROFESSIONAL ON MONDAY AT 9.