| 11/10/2011 |
STORMWATER FOLLOW-UP INSP |
|
Approved |
|
| 10/13/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
JAYS REPORT ON SITE. |
| 09/20/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
JAY WORK ING ON REPAIRS TO SWPP ON WEST SIDE . |
| 09/13/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
GOT WITH O'LEARY ON TACK-OUT CLEAN UP. |
| 09/09/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
GOT WITH JAY ON REPAIRING SWPPP CONTROLS. |
| 09/09/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
JAY REPAIRED SWPPP CONTROLS ON WEST SIDE OF JOB SITE. |
| 09/07/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
GOT WITH O' LEARY ABOUT CLEANING STREETS AND REPAIRING SWPP CONTROLS. |
| 08/30/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
GOT WITH JOHN TO REPAIR SWPP CONTROLS. |
| 08/18/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
REINSTALL SWPPP CONTROLS THAT VARE DOWN WENT OVER WITH JOHN. |
| 08/03/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
GOT WITH JAY ABOUT SWPP CONTOLS. |
| 07/27/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
JAY WORKING ON SWPPP CONTOLS. |
| 07/26/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
STREETS LOOK OK AFTER RAIN THIS WEEKEND. |
| 07/11/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
STREETS LOOK A LOT BETTER . WASHOUT LOOKS GOOD GOT WITH LARRY TO CALL BACK FOR GRADING INSPECTION. |
| 07/08/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
TRACK OUT HAS BEEN CLEANED UP. |
| 07/07/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
WALKED STREET WITH LARRY KUTZ FROM SUNT STREET NEEDS TO BE SWEAP . |
| 07/06/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
JOB SITE AND STREET LOOKS MUCH BETTER. |
| 05/20/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
NO CONCERNS AT THIS TIME. BEN WORKING ON A SMALL SET OF AP PLANS. |
| 05/13/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
GOT WITH BEN ABOUT TRACK OUT ON SOUTHWEST SIDEOF PROJECT. CURB AND SIDEWALK WORK GONIG ON. |
| 04/25/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
SWPPP OK AT THIS TIME. |
| 04/14/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Swppp OK at this time. |
| 04/08/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
SWPPP OK AT THIS TIME. |
| 04/04/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
SWPPP OK AT THIS TIME. |
| 03/30/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
TALK WITH BEN FROM SUNDT TO CLEAN TRASH AND REPAIR SWPPP CONTROLS AND CLEAN WASH OUT. |
| 03/21/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
NO CONCERNS AT THIS TIME. |
| 03/14/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
SWPPP OK AT THIS TIME. |
| 03/02/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
remone all trash from east side of project swppp and maintain all swpp per swppp plan. |
| 02/23/2011 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
WALK THRU WITH CONTRACTOR FOR ON SITE SWPPP |
| 01/31/2011 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Contractor had main gate where rock construction entrance is located closed today, so vehicle were using an entrance without rock. Told contractor that he needed to open main entrance. |
| 10/21/2010 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
METAL GRATES HAVE BEEN PLACE ALONG WITH STABILIZED CONST. ENTRANCE. HAS MINIMIZED TRACK-OUT. HAULING WILL CONTINUE TOMORROW. |
| 10/19/2010 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
MET WITH BEN--REINFORCED ENTRANCE. TRUCKS ARE BYPASSING ROCK AND TRACKING DIRT ON VIA INGRESSO TO MISSION. SWEEPER IS JUST MOVING DIRT AROUND. NEED TO FIND DIFFERENT SOLUTION. PER BEN TRUCKS WILL NOT CONTINUE HAULING TILL ISSUE IS RESOVED. |
| 10/18/2010 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
MET WITH BEN AND REP FROM O'LEARY RE: TRACK-OUT ON MISSION. |
| 10/15/2010 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
PER J. FEMLING. RECEIVED COMPLAINT REGARDING TRACK-OUT ON MISSION ROAD. WAS ON SITE APPROX. 3:30 PM. STREET SWEEPER WAS WORKING ON VIA INGRESSO WORKERS WERE USING HIGH-PRESSURE HOSE FROM WATER TRUCK TO SPRAY DOWN STREET AHEAD OF SWEEPER. WORKERS DISCONTINUED USE OF PRESSURE HOSE. I CONTACTED BEN TECHEYA SITE SUPV. REGARDING CONCERNS ON SITE. WILL HAVE A SITE MEETING WITH HIM AND SWWP PROFESSIONAL ON MONDAY AT 9. |