Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: RAINWATER - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 07/21/2010 |
RAINWATER - INTERMEDIATE |
|
Approved |
MET ON SITE WITH GREGG. WALKED BLUE-TOP. VERIFIED DIRECTIONAL FLOWS ALIGNED WITH SITE PLAN. ASKED IF SURVEYOR REPORT REFLECTED CORRECT GRADES AND INLET ELEVATIONS. WHEN PAVING CONTRACTOR ANSWERED IN THE AFFIRMATIVE, THEY WERE ALLOWED TO PROCEED. |
| 07/19/2010 |
RAINWATER - INTERMEDIATE |
|
Approved |
SPOKE WITH GREGG OF DPR TO SCHEDULE AN INTERMEDIATE RAINWATER INSPECTION PRIOR TO PAVING. |