Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2011 | GRADING - INTERMEDIATE | Approved | ||
| 07/19/2011 | GRADING - INTERMEDIATE | Continued | CONTRACTOR HAS INSTALLED THE STORM DRAIN PIPING FROM THE CATCH BASIN TO THE EXISTING TRUNK LINE. ROW SECTION WAS INSPECTED BY ROW INSPECTOR AND VERIFIED. | |
| 06/23/2011 | GRADING - INTERMEDIATE | Continued | 1) STORM DRAIN TIE-IN WILL BE DONE IN THE ROW - FROM CATCH BASIN TO EXISTING STORM PIPE. 2) VERTICLE CURBING HAS BEEN INSTALLED. 3) CONTRACTOR WORKING ON SUBGRADE FOR PARKING LOT. 4) ENSURE STORM WATER SURFACE FLOWS PER PLAN TO EXISTING CATCH BASIN. |
|
| 04/28/2011 | GRADING - INTERMEDIATE | Continued | 1) RE-ESTABLISH TEMP SEDIMENT CONTROLS ALONG THE PERIMETER. 2) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE. 3) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS REQUIRED BY YOUR SWPPP. 4) CALL FOR INSPECTION WHEN SITE WORK BEGINS. 5) SWEEP UP TRACKING OFF OF PUBLIC ROADWAYS AS NEEDED. |
|
| 02/16/2011 | GRADING - INTERMEDIATE | Continued | BUILDING BEING WORKED ON, NO SITE WORK. PERIMETER WALL HAS BEEN CONSTRUCTED PER APPROVED PLAN. STORM WATER CONTROLS IN PLACE NO SIGNIFICANT CONCERNS AT THIS TIME. | |
| 01/14/2011 | GRADING - INTERMEDIATE | Continued | NO ACTIVITY, NO ONE ON SITE. BLDG PAD POURED, PERIMETER WALL CONSTRUCTED. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
| 01/12/2011 | GRADING - INTERMEDIATE | Continued | NO ACTIVITY TODAY. FOUNDATION POURED FOR BLDG, PERIMETER WALL HAS BEEN COMPLETED. NO OTHER SITE WORK AT THIS TIME. NO STORM WATER CONCERNS AT THIS TIME |
|
| 12/27/2010 | GRADING - INTERMEDIATE | Continued | CHECKED SITE AFTER RAIN FOR DRAINAGE CONCERNS ALONG BLOCK WALL AT SE CORNER OF SITE - NO DRAINAGE PROBLEMS WERE APPARENT. NO STORM WATER CONCERNS AT THIS TIME. |
|
| 12/23/2010 | GRADING - INTERMEDIATE | Continued | BILL FETZER (SUPERINTENDENT) DEBRA WILLIAMS 548 -1990 275-1614 844-9374 (COMPLAINTANT) 1) NEED TO PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP. 2) COMPLAINT ON SITE OF NEW MASONRY WALL POTENTIALLY BLOCKING HISTORICAL FLOW AND FLOODING ADJACENT PROPERTIES. WILL SPEAK TO ENGINEER AND REVIEWER FOR DETAILS. NOT ADDRESSED ON APPROVED GRADING PLAN. 3) NO OTHER STORM WATER CONCERNS AT THIS TIME |
|
| 12/07/2010 | GRADING - INTERMEDIATE | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. CONTRACTOR DOING DIRT WORK AND UTILITY INSTALLATION AT THIS TIME, NO SITE WORK BEING DONE |