Permit: T10BU00828

Parcel: 11103058B

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
08/25/2011 STORMWATER FOLLOW-UP INSP Approved
06/23/2011 STORMWATER FOLLOW-UP INSP Continued
04/28/2011 STORMWATER FOLLOW-UP INSP Continued 1) RE-ESTABLISH TEMP SEDIMENT CONTROLS ALONG THE PERIMETER.
2) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE.
3) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS REQUIRED BY YOUR SWPPP.
4) CALL FOR INSPECTION WHEN SITE WORK BEGINS.
5) SWEEP UP TRACKING OFF OF PUBLIC ROADWAYS AS NEEDED.
02/16/2011 STORMWATER FOLLOW-UP INSP Continued BUILDING BEING WORKED ON, NO SITE WORK. PERIMETER WALL HAS BEEN CONSTRUCTED PER APPROVED PLAN. STORM WATER CONTROLS IN PLACE NO SIGNIFICANT CONCERNS AT THIS TIME.
01/14/2011 STORMWATER FOLLOW-UP INSP Continued NO ACTIVITY, NO ONE ON SITE. BLDG PAD POURED, PERIMETER WALL CONSTRUCTED.
NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
01/12/2011 STORMWATER FOLLOW-UP INSP Continued NO ACTIVITY TODAY. FOUNDATION POURED FOR BLDG, PERIMETER WALL HAS BEEN COMPLETED. NO OTHER SITE WORK AT THIS TIME.
NO STORM WATER CONCERNS AT THIS TIME
12/23/2010 STORMWATER FOLLOW-UP INSP Continued BILL FETZER (SUPERINTENDENT) DEBRA WILLIAMS
548 -1990 275-1614
844-9374 (COMPLAINTANT)

1) NEED TO PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP.
2) COMPLAINT ON SITE OF NEW MASONRY WALL POTENTIALLY BLOCKING HISTORICAL FLOW AND FLOODING ADJACENT PROPERTIES. WILL SPEAK TO ENGINEER AND REVIEWER FOR DETAILS. NOT ADDRESSED ON APPROVED GRADING PLAN.
3) NO OTHER STORM WATER CONCERNS AT THIS TIME
12/07/2010 STORMWATER FOLLOW-UP INSP Continued NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.

CONTRACTOR DOING DIRT WORK AND UTILITY INSTALLATION AT THIS TIME, NO SITE WORK BEING DONE
10/15/2010 STORMWATER FOLLOW-UP INSP Continued SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE NORTH, WEST AND EAST PROPERTY LINE. A STABILIZED CONSTRUCTION ENTRANCE HAS ALSO BEEN INSTALLED.

ENSURE STORM WATER CONTROLS ARE INSPECTED AND MAINTAINED PER YOUR SWPPP.
ENSURE TRACKED SOIL IS SWEPT ON A ROUTINE BASIS.

NO OTHER STORM WATER CONCERNS AT THIS TIME