Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/15/2010 | STORMWATER INSTALL OF CONTROLS | Approved | SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE NORTH, WEST AND EAST PROPERTY LINE. A STABILIZED CONSTRUCTION ENTRANCE HAS ALSO BEEN INSTALLED. ENSURE STORM WATER CONTROLS ARE INSPECTED AND MAINTAINED PER YOUR SWPPP. ENSURE TRACKED SOIL IS SWEPT ON A ROUTINE BASIS. NO OTHER STORM WATER CONCERNS AT THIS TIME |