Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T10BU00828

Parcel: 11103058B

Inspection Status: Approved

Inspection History: STORMWATER INSTALL OF CONTROLS

Date Description Inspector Results Comments
10/15/2010 STORMWATER INSTALL OF CONTROLS Approved SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE NORTH, WEST AND EAST PROPERTY LINE. A STABILIZED CONSTRUCTION ENTRANCE HAS ALSO BEEN INSTALLED.

ENSURE STORM WATER CONTROLS ARE INSPECTED AND MAINTAINED PER YOUR SWPPP.
ENSURE TRACKED SOIL IS SWEPT ON A ROUTINE BASIS.

NO OTHER STORM WATER CONCERNS AT THIS TIME