Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2011 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
| 10/04/2010 | ENGINEERING PRE-CONSTRUCTION | Continued | CHECKED STATUS OF SITE. NO ONE WAS ON SITE. NO WORK WAS IN PROGRESS. NO SWWP AVAILABLE. NO NOI POSTED. WATTLE HAS BEEN PLACED ALONG PERIMETER OF SITE BUT HAS NOT BEEN ANCHORED. CONSTRUCTION ENTRANCE HAS NOT BEEN STABILIZED. ISSUANCE OF STOP-WORK ORDER WILL BE DETERMINED BY AREA INSPECTOR. |
|
| 09/29/2010 | ENGINEERING PRE-CONSTRUCTION | Violation | CONTACTED SITE SUPINTENDENT (BRIAN SCHUYLER 548-3719) OF GALILEO CONSTRUCTION, INFORMED HIM THAT THE SITE IS IN NON-COMPLIANCE WITH NPDES/AZPDES, AND THE COT STORM WATER ORDINANCE. | |
| 09/29/2010 | ENGINEERING PRE-CONSTRUCTION | Continued | MET W/ SUPINTENDENT AND SITE FORMAN AT CONSTRUCTION SITE. 1) SITE IS CURRENTLY IN NON-COMPLIANCE W/ AZPDES AND THE CITY OF TUCSON STORM WATER ORDINANCE. 2) INSTALL SEDIMENT CONTROLS AND A STABILIZED CONSTRUCTION ENTRANCE PER YOUR APPROVED STORM WATER PLAN. 3) ENSURE COMPLIANCE BY MONDAY OCT 4TH, NON-COMPLIANCE WILL RESULT IN A STOP WORK ORDER. |
|
| 09/28/2010 | ENGINEERING PRE-CONSTRUCTION | Correction Required | SITE IS REQUIRED TO HAVE AN APPROVED STORM WATER PLAN ON SITE. THE STORM WATER PLAN MUST BE IMPLEMENTED PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR MUST CALL IN A PRECON MEETING WITH ENGNEERING PRIOR TO THE START OF CONSTRUCTION. THE SITE IS IN NON-COMPLIANCE WITH AZPDES/NPDES AND THE COT STORM WATER ODINANCE. |