Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
Permit Number - T10BU00570
Inspection Description - FIRE SPKLR - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/13/2011 | FIRE SPKLR - FINAL | Approved | ||
05/10/2011 | FIRE SPKLR - FINAL | Correction Required | Walk through done of all buildings some problems found a list was made re-inspection needed for repairs on list. | |
05/05/2011 | FIRE SPKLR - FINAL | Partial Approval | Building "A" Correct sprinkler coverage in Great room A121, south east ceciling pocket. Correct sprinkler coverage in trash and recycling room A122, north wall. Correct sprinkler coverage in mechanical room A114, duct work over 4' need coverage under and a sprinkler head blocked by piping south wall. Need to install inspectors test valve in elevator rooms for flow switches Need to paint and insulate sprinkler piping to elevator rooms or change piping to 2" or bigger to protect from freezing - DONE |
|
05/02/2011 | FIRE SPKLR - FINAL | Not ready for Inspection | 1. Add sprinkler coverage in closet front lobby building B-1. DONE 2. Tamper failed 4th floor building "E" - REPAIRED 3. Tamper and flow switch failed 2nd floor building "B" - REPAIRED 4. Tamper and flow switch failed 3rd floor building "B" - REPAIRED 5. Tamper and flow switch failed 4th floor building "B" - REPAIRED 6. Need to do 200 psi test on standpipe system building "B". DONE 7. Need to correct sprinkler coverage in tunnels both southwest and northwest exit ways. DONE |
|
05/02/2011 | FIRE SPKLR - FINAL | Not ready for Inspection | Pump test done passed waiting for print out - DONE have print out | |
03/22/2011 | FIRE SPKLR - FINAL | Not ready for Inspection | electrical not complete could not test fire pump. |