Date Description Inspector Results Comments
04/24/2012 GRADING - INTERMEDIATE Approved
10/31/2011 GRADING - INTERMEDIATE Continued WALLK THRU WITH DAVE .GOING OVER AP PLANS AND AND WHAT NEEDS TO BE COMPLET.
10/27/2011 GRADING - INTERMEDIATE Partial Approval All underground storm drainage has been inspected and approved including vault and vortex system.
08/03/2011 GRADING - INTERMEDIATE Correction Required Looked at the pipe from the vortex storm MH, PVC pipe stubbed into HDP is not acceptable told super that they will need to install a manufactured fitting or T to accept the PVC.
04/18/2011 GRADING - INTERMEDIATE Continued Storm vault has been completly covered, inlet pipes not installed yet.
04/14/2011 GRADING - INTERMEDIATE Continued Inlet and oput let pipe stubed out of vault, vault being backfilled.
04/12/2011 GRADING - INTERMEDIATE Continued Backfilling around storm vault today, will begin to install pipe tomorrow.
04/11/2011 GRADING - INTERMEDIATE Continued Storm vault in place, liner being installed. No pipes installed yet.
03/22/2011 GRADING - INTERMEDIATE Continued Work continues on main building, site work to follow.
12/16/2010 GRADING - INTERMEDIATE Continued Spoke to contractor installing the storm drains around building and discussed who will be the inspector. Ther storm line under the building foot print will be inspected by plumbing inspector, outside the building to storm vault will be inspected by me.
11/04/2010 GRADING - INTERMEDIATE Continued Discussed potential grade change along west side of building, roof deck for garage raised aboiut 1 foot may effect slope to existing sidewalk along Scott Ave. I suggested that they get with Civil and landscape Arch to determine if cahnges need to be made to slope and or treatment.