Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T10BU00567
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/24/2012 | GRADING - INTERMEDIATE | Approved | ||
10/31/2011 | GRADING - INTERMEDIATE | Continued | WALLK THRU WITH DAVE .GOING OVER AP PLANS AND AND WHAT NEEDS TO BE COMPLET. | |
10/27/2011 | GRADING - INTERMEDIATE | Partial Approval | All underground storm drainage has been inspected and approved including vault and vortex system. | |
08/03/2011 | GRADING - INTERMEDIATE | Correction Required | Looked at the pipe from the vortex storm MH, PVC pipe stubbed into HDP is not acceptable told super that they will need to install a manufactured fitting or T to accept the PVC. | |
04/18/2011 | GRADING - INTERMEDIATE | Continued | Storm vault has been completly covered, inlet pipes not installed yet. | |
04/14/2011 | GRADING - INTERMEDIATE | Continued | Inlet and oput let pipe stubed out of vault, vault being backfilled. | |
04/12/2011 | GRADING - INTERMEDIATE | Continued | Backfilling around storm vault today, will begin to install pipe tomorrow. | |
04/11/2011 | GRADING - INTERMEDIATE | Continued | Storm vault in place, liner being installed. No pipes installed yet. | |
03/22/2011 | GRADING - INTERMEDIATE | Continued | Work continues on main building, site work to follow. | |
12/16/2010 | GRADING - INTERMEDIATE | Continued | Spoke to contractor installing the storm drains around building and discussed who will be the inspector. Ther storm line under the building foot print will be inspected by plumbing inspector, outside the building to storm vault will be inspected by me. | |
11/04/2010 | GRADING - INTERMEDIATE | Continued | Discussed potential grade change along west side of building, roof deck for garage raised aboiut 1 foot may effect slope to existing sidewalk along Scott Ave. I suggested that they get with Civil and landscape Arch to determine if cahnges need to be made to slope and or treatment. |