Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date |
Description |
Inspector |
Results |
Comments |
| 04/24/2012 |
STORMWATER FOLLOW-UP INSP |
|
Approved |
|
| 08/04/2011 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Need to replace waddel along west side of project and remove waste from material dump container. |
| 06/30/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Spoke to contractor they will have a street sweeper clean up track out on Broadway and 6th Ave. today. |
| 06/23/2011 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Contractor needs to remove silt from Broadway entrace and install waddel at west end of access. |
| 04/11/2011 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
New waddel has been placed, storm controls OK. |
| 03/22/2011 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Minor track out on 6th and broadway due to rain last night |
| 12/16/2010 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Contractor needs to refreash straw waddel in areas around the entire site, need to install waddel at entrance off of Broadway, need to clean up conc. debris at construction entrance. |
| 11/04/2010 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Contractor needs to replace straw waddel along Broadway and Scott Ave as needed. Also needs to install inlet protection for CB on North side of Broadway. |
| 08/16/2010 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Checked storm controls all in place, discussed concrete washout plans for tomorrows conc. pour, contractor will use roll off containment during pour. |
| 07/20/2010 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Walked site for storm controls, need to place gravel bags on straw waddel along the north perimeter of site, all other controls OK. |
| 06/14/2010 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Checked site today onsite and off site storm controls in place, no track out. NOI posted. |
| 06/01/2010 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Spoke to T with Ryan Comp. need to post NOI at site entrance, need to install swppp controls along west edge (Scott ave)of project |