Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2010 | STORMWATER INSTALL OF CONTROLS | Approved | 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE WEST, NORTH, AND EAST PERIMETERS. 2) MAY NEED TO ADD A STABILIZED CONSTRUCTION ENTRANCE AND A DESIGNATED CONCRETE WASH-OUT AT A LATER TIME. 3) CONTRACTOR MUST ENSURE STORM WATER SELF INSPECTIONS ARE ACCOMPLISHED THROUGHOUT CONSTRUCTION. 4) CONTINUE TO SWEEP UP TRACKED SOIL OFF PUBLIC ROADWAYS AS NEEDED. 5) FOLLOW UP INSPECTIONS WILL BE COMPLETED THROUGHOUT CONSTRUCTION |