Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 11/10/2010 |
GRADING - FINAL |
|
Approved |
|
| 11/09/2010 |
GRADING - FINAL |
|
Partial Approval |
SITE HAS CHANGED BUT REVISED DRAWINGS HAVE NOT BEEN PROVIDED. WILL VERIFY CHANGES IN THE OFFICE THE RE-INSPECT TOMORROW |
| 10/05/2010 |
GRADING - FINAL |
|
Partial Approval |
I HAVE ALSO BEEN ADVISED THAT THIS SITE WILL BE COMPLETED WITHIN THE NEXT 2 WEEKS FOR THE GRADING PERMIT. A FINAL INSPECTION WILL BE CALLED IN ONCE THE WORK HAS BEEN COMPLETED. |
| 09/14/2010 |
GRADING - FINAL |
|
Partial Approval |
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|
| 08/31/2010 |
GRADING - FINAL |
|
Not ready for Inspection |
SITE NOT READY AT THIS TIME FOR THE FINAL GRADING INSPECTION. WORK CONTINUES AROUND ALL BUILDINGS. THE ENTRANCE OFF OF CAMINO SECO HAS STILL NOT BEEN COMPLED AT THIS TIME. THE DEVELOPER PLACED ENOUGH SOME TEMPORARY ASPHALT BETWEEN THE EAST CURB RETURN AND THE JOIN LINE ALONG THE EDGE OF CAMINO SECO. THE DEVELOPER ADVISED ME THAT THE WORK SHALL BE COMPLETED AT THE END OF THIS WEEK OR THE FIRST OF NEXT WEEK. HE WILL RESCHEDULE ANOTHER INSPECTION AT THAT TIME. |
| 07/22/2010 |
GRADING - FINAL |
|
Not ready for Inspection |
THIS SITE IS ON GOING AT THIS TIME, FINAL INSPECTION WILL NOT BE NEEDED TILL THE SITE IS COMPLETE. |