Inspection Status: Approved
Inspection History: GRADING - CHECK FOR ACTIVITY
| Date |
Description |
Inspector |
Results |
Comments |
| 11/09/2010 |
GRADING - CHECK FOR ACTIVITY |
|
Approved |
|
| 10/05/2010 |
GRADING - CHECK FOR ACTIVITY |
|
Partial Approval |
MET WITH THE DEVELOPER THIS MORNING AND DISCUSSED WHAT IS THE PLAN FOR THE REMAINING TIME ON THIS SITE. HE WILL BE COMPLETING BUILDING #3 IN THE NEXT MONTH ALONG WITH THE LANDSCAPIONG. THE INTENTION AT THIS TIME IS THAT THERE WILL BE NO OTHER CONSTRUCTION STARTED ON THE REMAINING PADS, THEY WILL BE DEVELOPED IN THE FUTURE. THE TEMPORARY BUILDING THAT HAS BEEN SET ON THE NORTHSIDE OF THIS SITE WILL STAY IN PLACE UNTIL THE PADS ARE GOING TO BE DEVELOPED. THE DISTURBED AREAS THROUGHOUT THE SITE WILL BE COVERED WITH DECOMPOSED GRANITE PRIOR TO THE SCHEDULING OF THE FINAL GRADING INSPECTION FOR THE GRADING PERMIT. I WILL ASK JIM TO LOOK AT THE DETENTION / RETENTION BASINS ON THIS SITE SO THAT THEY CAN BE INCLUDED IN THE MASTER PLAN FOR THE CITY. |
| 08/31/2010 |
GRADING - CHECK FOR ACTIVITY |
|
Continued |
CREWS CONTINUE TO GRADE AROUND THE SITE, BUILDINGS 2 AND 3(SOUTHSIDE) ARE BEING CONSTRUCTED, BUILDINGS 4 AND 5(NORTHSIDE) WILL BE STARTED IN THE NEAR FUTURE. THE ENTRANCE OFF OF CAMINO SECO STILL HAS NOT BEEN COMPLETED AT THIS TIME, BUT A TEMPORARY C OF O FOR BUILDING ONE HAS ALREADY BEEN ISSUED. |
| 07/21/2010 |
GRADING - CHECK FOR ACTIVITY |
|
Not ready for Inspection |
THIS SITE IS ON GOING AT THIS TIME, FINAL INSPECTION WILL NOT BE NEEDED TILL THE SITE IS COMPLETE. |