Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/13/2010 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 05/18/2010 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* PRESSURE TEST TO HOLD 10 PSI |
|
| 01/12/2010 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) FROM STUB UP AT METER LOCATION TO STUB UP AT BBQ ? POOL 2" PARTIAL APPROVAL, RETEST WITH REINSPECTION FOR COMPLETION TO ALL VAVLES AND TIE IN |
|
| 01/06/2010 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE FACTORY COATED PIPING FOR ALL BELOW GRADE PIPINT THAT IS IRON PIPE 2) PROVIDE PIPE TAPE PRIMER THEN TAPE ALL TOOL MARKS AND FITTINGS BELOW GRADE TO 6" ABOVE GRADE LEVEL |