Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/09/2010 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 11/01/2010 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE APPROVED FLUE VENT WATER HEATER 2) PROVIDE CSA APPROVED VALVES AND FLEXES FOR STOVE AND FURNACE 3) CLEANOUT TRENCH FROM METER TO HOUSE |
|
| 02/09/2010 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE MINIMUM 10 PSI TEST ON ALL GAS PIPING 2) COMPLETE GAS PIPING FOR WATER HEATER WITH CSA APPROVED GAS VALVE AND FLEX 3) PROVIDE VALVE AND FLEX FOR STOVE 4) PROVIDE SUPPORT ON ALL GAS PIPING |