Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/02/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 12/01/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) WATER HEATER REQUIRES VENT COLLAR 2) NO THREADS ALLOWED AT T & P RELIEF DRAIN 3) UNDERGROUND PIPING TO 6" ABOVE GRADE TO BE SCOTCH COAT (GREEN) 4) TAPING IS FOR FITTINGS AND MARRED PIPE-TAPING TO BE 1/2 OR LAPPED WITH DBL WRAP 5) NO TEST ON SYSTEM, REQUIRES 10 POUNDS 6) SEDIMENT TRAPS WAIVED 7) WOOD SHIMS NOT ACCEPTED |
|
| 11/23/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE MINIMUM OF 10 PSI TEST ON ALL GAS PIPING 2) COMPLETE INSTALL OF FLUE VENT FOR WATER HEATER AND 1" CLEANOUT OF WOOD AND CABLE 3) RUN T & P FOR WATER HEATER 6" TO 24" OFF GROUND 4) PROVIDE TAPE AND PRIMER FOR ALL FITTINGS AND TOOL MARKS 5) PROVIDE STEEL HARD PIPING IN THRU SIDE WALL NOT FLEX FOR WATER HEATER 6) PROVIDE APPROVED FLUE VENT AND CAP FOR FURNACE |