Permit: T09PL01937

Parcel: 13303301A


Addresses:

9971 E SPEEDWAY BL

Inspection Status: Approved

Inspection History: SITE - SEWER

Date Description Inspector Results Comments
02/01/2012 SITE - SEWER Approved IVRS - Inspection :*
01/24/2012 SITE - SEWER Not ready for Inspection IVRS - Inspection :*
10/14/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
1) VACUUM TESTING WITNESSED AND COMPLETED BY STEVE MAGELL
10/13/2011 SITE - SEWER Not ready for Inspection IVRS - Inspection :*
1) GROUTING MANHOLES
2) NO TESTING
10/12/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
1) AIR TESTING WITNESSED BY STEVE MAYELLI WITH BARKER AND ASSOC. ENGINEERING
10/11/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
1) REWORK AT MH3
10/07/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
1) HCS LATERALS FOR BS #4 + 5, 9 + 10
2) MAIN THRU MH #17
10/06/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
8" SDR FROM MH#16 TO MH#17 INCLUDED COMBO FOR BLD?
MH#16 & 17 BASES PPECRAS
MH #17 4"HCS STUB TO BLD 1, 4" STUB TO EAST
2) 4" HCS FOR BLD 8& BLD 6 INTRALLED
10/05/2011 SITE - SEWER Partial Approval LATERALS TO B5, 6, 7 AND 18
MAIN BETWEEN 15 AND 16 W. HCS WYES
10/04/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
1) PIPING BETWEEN MH 14 & 15 AND BETWEEN 15 & 16 WITH HCS
2) WYES OK TO COVER-SUBJECT TO TESTING
10/03/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
1) PIPING BETWEEN MH 1 + 14 WITH HCS WYE
09/30/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
1) PIPING BETWEEN 6-13 OK-MANHOLE 6 AND 13 ARE READY TO POUR
09/29/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
1) PIPING THRU MH #7 WITH HCS WYE AT B #13
2) MANHOLE BASES #5 & 7 BEING POURED
3) WATER STOPS IN PLACE AND TRACER WIRE INSTALLED
09/28/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
1) MH 3 & 4 BASES OK
2) HCS STUB AT #3
3) PIPING BETWEEN 3 & 4 AND 4 & 5
09/27/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
1) 8" SDR FROM EXISTING #7 TO NEW MANHOLE #1, TO MANHOLE #2 INCLUDING 4" HCS TO BLDG 24, 4" WYE IS IN FOR BLDG #11, 8" CONTINUES TO MANHOLE #3 WITH 4" WYE FOR BLDG 12 BEDDING, LAYING, TRACER AND SHADING
2) 8" CUTILE FROM MANHOLE #4 TOWARDS MANGHOLE #5 APPROX. 53' BORED, PUSHED AND GROUTED FROM MANHOLE #1 28' GOING SOUTH. MANHOLE #1 AND MANHOLE #2 BASES POURED