Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/24/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) GAS CARD AT METER |
|
| 11/23/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) VENTING FROM WATER HEATER AND FURNACE TO BE INSTALLED CORRECTLY WITH APPROVED MATERIALS PER INSPECTION FROM 11/20/09 |
|
| 11/20/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE 90 DEGREE DOWN AT TEMPERATURE AND PRESSURE RELIEF DRAIN ON EXTERIOR (CPVC PIPING AND GLUE PRIMER IF REQUIRED) 2) PROVIDE CORRECT SIZE VENTING AND MATERIAL TYPE FOR WATER HEATER AND FURNACE VENTS, SHALL BE DBL WALL THRU CEILING AND ROOF TERMINATING WITH DBL WALL VENT CAP MINIMUM 3' ABOVE TOP OF COOLER INTAKE. PROVIDE FASTENERS AT ALL VENT JOINTS 3) PROVIDE BONDING OF BLDG GAS PIPING 4) APPLIANCE SHUT OFF VALVES TO BE ACCESSIBLE 5) SEAL FLOOR OF RETURN AIR PLENIUM 6) PROVIDE RIDGID PIPE NIPPLE THRU APPLIANCE HOUSING OF FURNACE |