Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/02/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/25/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* GUEST HOUSE: 1) SECURE GAS PIPING IN WATER HEATER/FURNACE CLOSET 2) SEAL ALL PIPE PENTRATIONS INTO STRUCTURE 3) REMOVE AND CAP OLD GAS PIPING 4) SUPPORT GAS PIPING IN ATTIC CORRECTLY 5) PROVIDE 1" MINIMUM CLEARANCE FROM COMBUSTIBELS FOR WATER HEATER/FURNACE VENT 6) VERIFY WATER HEATER TEMPERATURE AND PRESSURE RELIEF IS FUNCTIONAL 7) EXTEND DBL WALL VENT TO 3' ABOVE TOP OF COLLER INTAKE WITH DBL WALL VENT PIPING 8) PRIME ALL TOOL MAKRS AND FITTING UNDERGROUND TO 6" ABOVE GRADE, THEN WRAP WITH PIPE TAPE WRAP TO ACHIEVE 40 MIL THICKNESS 9) INSTALL APPROVED GAS APPLIANCE SHUT OFF VALVES ON PIPING AND RETEST 10) LIST NOT COMPLETE |
|
| 11/16/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) COMPLETE INSTALLATION AND RECALL FOR INSPECTION |