Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/02/2009 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 11/25/2009 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* MAIN HOUSE: 1) PROVIDE ROOF FLASHING AT PIPE PENETRATION THRU ROOF 2) SUPPORT PIPING ON ROOF AT CORRECT INTERVALS AND CHANGES OF DIRECTION MINIMUM 1 1/2" UP OFF OF ROOF WITH WEATHER RESISTANT MATERIALS 3) COMPLETE GAS PIPING TO ALL APPLIANCES AND SECURE AT ALL AREAS 4) WATER HEATER REQUIRES DBL WALL VENT THRU ROOF TO TERMINATION AT APPROVED VENT CAP 5) PROVIDE FASTENERS AT ALL VENT PIPING JOINTS (SINGLE WALL) |
|
| 11/16/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* |