Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/18/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/16/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) A SPLIT IS NOT AN APPROVED METHOD TO REPAIR GROUNDING CONDUCTOR 2) PROVIDE A CADWELD OR AN IRREVERSABLE CRIMP AS MEANS TO REPAIR GROUNDING CONDUCTOR |
|
| 11/13/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE APPROVED METHOD FOR REPAIR OF GROUNDING WIRE FOR BLDG ELECTRICAL THAT WAS SECURED BY NORTHERN PIPE LINE 2) GAS CARD AT METER |