Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) CORRECTIONS MADE OK 2) OK FOR GAS 3) UCC LEFT AT METER |
|
| 11/18/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) VENT FROM FURNACE IS INSTALLED UPSIDE DOWN AND NEEDS TO BE INSTALLED PER IT'S LISTING |
|
| 11/12/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE SEDIMENT TRAPS AT GAS ENTRY TO APPLIANCES 2) VENT FROM WATER HEATER TO BE ATTACHED TO DRAFT HOOD, DRAFT HOOD TO BE INSTALLED CORRECTLY, VENT TO HAVE FASTENERS AT ALL JOINTS WITH DBL WALL VENT PIPING THRU ROOF STRUCTURE WITH 1" MINIMUM CLEARNACE FROM COMBUSTIBLES TERMINATING WITH APPROVED DBL WALL VENT CAP 3) VENT FROM FURNACE TO BE 3' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE WITH FULL SIZE DBL WALL VENT PIPING 4) WATER HEATER TO HAVE FULL SIZE APPROVED TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING GRAVITY DRAIN TO DAYLIGHT TERMINATING 90 DEGREE DOWN 6" TO 24" FROM FINISH GRADE 5) SUPPORT AND SECURE WATER HEATER VENT PIPING ON HORIZONTAL AT CHANGES OF DIRECTION 6) PROVIDE CORRECT UPPER COMBUSTION AIR TO WATER HEATER 7) PROVIDE BONDING OF BLDG GAS SYSTEM |