Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/10/2009 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SEE NOTE #1 FROM 11/02/09 INSPECTION 2) MAXIMUM BREAKER IN ELECTRICAL PANEL FOR 4500 WATTS AT WATER HEATER TO BE 30 AMP BREAKERS 3) 03050-TEST MUST HOLD 10 PSI FOR MINIMUM 15 MINUTES WITH NO LOSS OF PRESSURE |
|
| 11/02/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) TEST TO BE IN PLACE AND HOLD MINIMUM 10 PSI WITH NO LOSS OF PRESSURE AT TIME OF INSPECTION |