Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) CORRECTIONS HAVE BEEN MADE 2) OK FOR GAS 3) UCC LEFT AT METER |
|
| 10/22/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) T & P RELIEF MAY NOT TERMINATE AT THE ROOF |
|
| 10/20/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) WATER HEAER IS NOT INSTALLED |
|
| 10/15/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) GAS PRESSURE TEST OK 2) OK TO COVER UNDERGROUND 3) OK TO COVER WALLS 4) INSTALL ALL VALVES AND FLEXES 5) INSTALL SEDIMENT TRAP ON FURNACE AND WATER HEATER 6) CONNECT VENT AT FURNACE 7) HAND PIPE TO OUTSIDE FURNACE WALL |