Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/09/2010 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 06/07/2010 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE A 10 PSI AIR TEST ON SYSTEM 2) REPAIR ALL LEAKS BEFORE CALLING FOR INSPECTION |
|
| 06/03/2010 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE A 10 PSI AIR TEST ON SYSTEM 2) PROVIDE AN OPERATIONAL T & P RELIEF VALVE 3) SECURE VENT TO WH DRAFT COLLAR 4) BOND TO UN-COATED PIPING |
|
| 04/01/2010 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE FACTORY COATED PIPING FOR UNDERGROUND GAS PIPING 2) PROVIDE TRIMMER AND TAPE ON ALL FITTING UNDERGROUND 3) UNION CANNOT BE USED UNDERGROUND 4) PROVIDE SEDIMENT TRAP AT WATER HEATER 5) PROVIDE TYPE B FLUE CAP AT WATER HATER 6) HAVE DRAWINGS AND PERMIT ON SITE 7) LIST MAY NOT BE COMPLETE |