Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/21/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/20/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) DBL WALL VENT TO BE IN DIRECTION OF FLOW ARROW WITH APPROVED VENT CAP |
|
| 10/16/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SEAL PIPE OPENING INTO BLDG 2) SECURE GAS PIPING AT WATER HEATER 3) INSTALL GAS VALVES AND RETEST 4) PROVIDE BONDING OF BLDG GAS PIPING 5) WATER HEATER TEMPERTURE AND PRESSURE RELIEF SHALL BE FUNCTIONAL AND GRAVITY DRAIN FULL SIZE PIPING TERMINATE AT 90 DEGREE DOWN ON EXTERIOR OF STRUCTURE 6" TO 24" FROM FINISH GRADE (CPVC) 6) VENT THRU ROOF TO BE DBL WALL WITH 1" MIN. CLEARNACE FROM WOOD STRUCTURE, VENT CONNECTOR PIPING TO HAVE 3-APPROVED FASTENERS, WITH ROOF FLASHING AND APPROVED VENT CAP FOR WATER HEATER 7) MAKE FUTURE ROOF TOP GAS STUB FLASHING WEATHER TIGHT WITH ROOF MASTIC OR TAR |