Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/13/2009 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 10/09/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE MINIMUM 12" OF COVER FOR UNDERGROUND PIPING 2) PROVIDE PIPE PRIMER THEN TAPE ALL TOOL MARKS AND FITTINGS UNDERGROUND TO 6" ABOVE GRADE 3) PROVIDE APPROVED GAS APPLIANCE SHUT OFF VALVES AT ALL APPLIANCES 4) NEW WATER HEATER REQUIRES CORRECT VENT CONNECTION TO DRAFT HOOD WITH 3-GALV SCREWS AT EACH VENT JOINT, GOING UP HILL TO TERMINATION 5) PROVIDE DRIP PAN WITH PLUG IN DRAIN TERMINATE TEMPERATURE AND PRESSURE RELIEF DRAIN WITH CPVC, COPPER, GALV PIPING WITH NO THREADED END 1" ABOVE LIP OF DRIP PAN AND HAVE PETITION OF APPEAL SIGNED BY OWNER AND ON SITE 6) PROVIDE BONDING OF BLDG GAS SYSTEM 7) SUPPORT PIPING FOR DRYER |