Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/13/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/08/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) RECEIVED APPEAL FOR T & P 2) VENT EXTENSION FOR WATER HEATER TO BE DBL WALL FULL SIZE VENT THRU ROOF AND TO APPROVED VENT CAP |
|
| 10/06/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) TEMPERATURE RPESSURE RELIEF TO TERMINATE PER APPEAL LEFT O SITE AND BE SIGNED BY OWNER 2) VENT PIPING TO VALVE NO TAPE, PROVIDE FASTENERS AT VENT JOINTS AND EXTEND VENT TERMINATION TO 2' ABOVE AIR INTAKE WITH APPROVED VENT CAP |