Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 09/25/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) TEST IS NOT HOLDING. DROPPED 2/10 IN 13 MINUTES 2) PROVIDE ANOTHER JUMPER BOND AROUND THE DIELECTRIC UNION ON GUEST HOUSE |
|
| 09/24/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SEAL THE WATER HEATER TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING HOLE INTO THE STRUCTURES 2) SECURE GAS PIPING AT FURNACE 3) PROVIDE CORRECT COMBUSTION AIR FOR BOTH WATER HEATERS 4) PROVIDE BONDING OF BACK STRUCTURE GAS PIPING SYSTEM FOR BLDG |