Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/18/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 12/17/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE BONDING NOT GROUNDING OF BLDG GAS SYSTEM |
|
| 12/16/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) NEW WATER HEATER REQUIRES TEMPERATURE AND PRESSURE RELIEF DRAIN PIPE (COPPER, GALV, CPVC MATERIAL) TERMINATING AT DOWNWARD DIRECTION 6" TO 24" FROM FINISH GRADE 2) PROVIDE DBL WALL VENT PIPING FROM WATER HEATER THRU ROOF PROPERLY FLASHED AT ROOF LEVEL WITH CORRECT VENT CAP 3) PROVIDE SEDIMENT TRAP AT GAS ENTRY TO WATER HEATER 4) PROVIDE BONDING OF METALIC BLDG GAS PIPING 5) PROVIDE A PERMANENT CAP AT STOVE VALVE LOCATION IF GAS STOVE IS NOT USED |