Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T09PL01526
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/28/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
09/25/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) UNIT #29 TEST ON GAS CARD AT METER 2) SECURE GAS PIPE IN A.C./FURNACE AND WATER HEATER CLOSET PER NOTES FROM 9/22/09 OBTAIN WATER HEATER AND NEW A.C./FURNACE PERMITS: 1) PROVIDE PROTECTION GROMET THRU A.C./FURNACE HOUSING FOR ELECTRIC PLUG IN 2) REMOVE ALL TAPE FROM ALL VENT JOINTS FOR INSPECTION, ONLY FASTENERS ARE REQUIRED 3) PROVIDE GASKET TO SEAL RETURN AIR PLENIUM AREA FROM COMBUSTION AREA OF UNITS 4) DUCT WORK FROM NEW UNIT TO TIE INTO EXISTING FOR A.C./FURNACE TO BE CORRECTLY INSULATED 5) LIST MAY NOT BE COMPLETE |
|
09/22/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* UNIT #29: 1) NOTE-IF YOU INSTALL A NEW FURNACE AND OR WATER HEATER. PROVIDE CORRECT PERMITS. (BOTH ARE REMOVED) COMPLETE ALL INSTALLATION. BE WILL NEED TO RETEST ON COMPLETION OF WALL WORK. NOTE: GAS PIPING TO BE ARRANGED SO YOU CAN REMOVE BOTH FURNACE AND WATER HEATER UPON COMPLETION OF NOTES FROM 9/18/09 UNIT #31: 1) TEST OK-GAS CARD AT METER FOR THIS UNIT |
|
09/21/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
09/18/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) UNIT #10-PSI TEST OK-GAS CARD FOR THIS UNIT ONLY UNIT 29: 1) VERIFY CORRECT T & P DRAIN AND TERMINATION 2) VERIFY CORRECT RISE ON FURNACE VENT 3) PROVIDE TEST ON ENTIRE GAS SYSTEM AT TIME OF INSPECTION 4) WATER HEATER IS LEAKING AND FLOOR OF WATER HEATER REQUIRES CORRECT REPAIR TO SUPPORTN LOAD OF WATER HEATER UNIT 31: 1) COMPLETE ALL PIPING, COMPLETE T & P AND VENTING REQUIREMENTS FOR GAS APPLIANCES, PROVIDE BONDING 2) LIST NOT COMPLETE 3) TEST COMPLETE SYSTEM 4) SEAL PIPING PENETRATIONS INTO BLDG FOR GAS. IN THE FUTURE PROVIDE SEPERATE PERMITS FOR EACH UNIT IF YOU CANNOT COMPLETE WORK FOR ALL SYSTEMS FOR INSPECTION |