Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/25/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) CORRECTIONS MADE OK 2) OK FOR GAS |
|
| 09/22/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) GAS PIPING MAY NOT RUN ON THE ROOF, MUST BE KEPT A MINIMUM OF 1 1/2"-3 1/2" ABOVE THE ROOF 2) ALL PENETRATIONS REQUIRE FLASHINGS 3) AT WATER HEATER: A) REQUIRE AN APPROVED VALVE AT COLD WATER INLET B) REQUIRE APPROVED MATERIALS FOR T & P RELIEF DRAIN C) T & P RELIEF DRAIN TO TERMINATE AT EXTERIOR OF BLDG WITH NO THREADS 4) USE APPROVED MATERIAL FOR WATER HEATER VENT ("B" VENT OUTSIDE) AND MAINTAIN 1" CLEARANCE FOR COMBUSTIBLES |