Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/17/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 09/15/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SECURE GAS PIPING TO STOVE, CAP OLD GAS PIPING 2) EXTEND DLB WALL VENTS FROM WATER HEATER/FURNACE TO 3' ABOVE TOP OF COOLER INTAKE WITH APPROVED FULL SIZE DBL WALL VENT PIPING WHEN WITHIN 10' OF COOLER INTAKE 2) PROVIDE BONDING OF BLDG GAS PIPING 3) SECURE UNISTRUT THAT IS STACKED HOLDING GAS PIPING ON ROOF 4) VALVE AREA OF GAS PIPING FOR WATER HEATER/FURNACE NEEDS TO BE ARRANGED TO PROVIDE AREA TO REMOVE WATER HEATER |