Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 09/29/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) BONDING TO BE TO COLD SIDE OF WATER SYSTEM PRIMER TO BE TO PIPE, FITTINGS AND TOOL MARKS, THEN TAPE TO ACHIEVE 40 MIL WRAP ON UNDERGROUND PIPING |
|
| 09/21/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) TEST TO BE MINIMUM 10 PSI AT TIME OF INSPECTION. TEST GUAGE TO BE IN 1/10 POUND INCREMENTS AND HOLDING TEST FOR 15 MINUTES 2) PROVIDE PIPE PRIMER THEN TAPE ALL UNDERGROUND FITTINGS AND TOOL MARKS TO ACHIEVE 40 MIL OF TAPE WRAP FOR PIPE PROTECTION 3) PROVIDE CORRECT CONNECTION FOR SINGLE TO DBL WALL VENT AT WATER HEATER. THE INEER LINER PIPE IS LIFTED UP AND OUT OF DLB WALL AND VENT CAP IS REQUIRED TO TERMINATE CORRECTLY 4) REMOVE THE FUTURE TEE CONNECTION AT BLDG ENTRY ON EXTERIOR OR PROVIDE REVISED CITY APPROVED GAS PLAN SHOWING IT 5) PROVIDE BONDING OF BLDG GAS PIPING SYSTEM |