Inspection History Details
Inspection Status: Partial Approval
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/04/2010 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1) BOND BOTH GAS PIPES DOWN STREAM OF METERS 2) T & P TERMINATION 6"-24" ABOVE GRADE 3) BREAK OFF LOCK SCREWS ON VACUUM BREAKERS 4) COMPLETE INSPECTION OF INTERIOR PLUMBING AS NOTED |
|
| 12/29/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) I WILL ACCEPT BELOW GRADE EXTERIOR GAS PIPING INSTALLED WITHOUT INSPECTION TEST HOLDING AT NEW WATER HEATERS: 1) INSTALL TYPE B VENT PER IT'S LISTING (INSTALLATION INSTRUCTIONS) WITH APPROVED CAP 2) ALL VENT PIPE OUTSIDE OF ENCLOSURE IS REQUIRED TO BE DBL WALL 3) PROVIDE PROPER T & P TERMINATION 4) PROVIDE SEDIMENT TRAP 5) HOSE BIB REQUIRES VACUUM BREAKERS 6) ALL EXTERIOR VENT PIPES REQUIRE UV PROTECTION INSIDE BLDG: 1) ALL WORK HAS BEEN COVERED WITHOUT INSPECTIONS, EXPOSE ENOUGH TO SEE YOUR CONNECTIONS TO EXISTING PIPES, AS PREVIOUSLY DISCUSSED 2) AT TUB DIVERTER AND DRAIN, UNDER KS 3) NEW DRAIN PIPING AND NEW WATER PIPING REQUIRE INSPECTION |