| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/02/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* NEED ISOLATION VALVE FOR APPLIANCES AND APPROVED PIPE SUPPORTS AT OXP TANKS MANUFACTURE REQUIREDS THAT TEMPERATURE + PRESSURE RELIEF VALVE GET TESTED ANNUALLY, AND REPLACED OF NECCESARY. WHS ARE OLD. ALL BASIC SAFETY REQUIREMENTS HAVE BEEN CORRECTED. PROVIDE PERMITS AS NEEDED FOR FURTURE "REPLACEMENTS" |
|
| 09/17/2009 | PLUMBING - FINAL | Not ready for Inspection | THERE ARE SEVERAL WH'S ON THIS SITE. PROVIDE CORRECT SUPPORTS AT ROOF PROVIDE CORRECT VENT TERMINATION (TYPE B) PROVIDE FLASHINGS PROVIDE SEPARATE GAS SOV'S? REMOVE CHOCK VALVE AT WH OR INSTALL EXPANSION DEVICE AT WH THIS IS A CLOSED LOOP SYSTEM AND A METHOD TO CONTROL EXPANSION OF HW SYSTEM IS REQUIRED (WH'S #4) PIPE T&P TO EXTERIOR W/APPROVED MATERIALS. PROVIDE CLEARANCE AT VENT PENATRATIONS SECURE SINGLE WALL W/SCREWS. B BENT TERMINATION IS 1' ASV ROOF IF NO AIR INLET |