Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/28/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/27/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CENTER THE WATER HEATER DRAFT HOOD ON OUTLET OF WATER HEATER AND PROVIDE 1" CLEARANCE FROM COMBUSTIBLES (WOOD) AT CEILING OF DBL WALL VENT PIPING OF WATER HEATER. DRAFT HOOD NEEDS TO DROP INTO TABS THAT SECURE IT TO WATER HEATER 2) PROVIDE BONDING OF BLDG GAS PIPING SYSTEM 3) REATTACH BLDG GROUND WIRE TO WATER SERVICE |