Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/31/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/27/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) TEST SHALL BE ON ENTIRE GAS SYSTEM HOLDING MINIMUM 10 PSI FOR 15 MINUTES UPON INSPECTION ARRIVAL 2) PROVIDE BONDING OF BLDG GAS PIPING 3) PIPING UNDERGROUND TO BE PRIMED THEN TAPED TO ACHIEVE 40 MIC WRAP 4) PIPING IN GROUND TO BE SUPPORTED ON FIRM BEDDING IN IT'S ENTIRETY 5) TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING TO TERMINATE AT 90 DEGREE DOWN ON EXTERIOR WITH NO THREADED END 6) PROVIDE APPROVED GAS SHUT OFF VALVES AT APPLIANCES 7) ROOF TOP PIPING TO FURNACE REQUIRES SUPPORT OR PERM CAP ON BLDG INTERIOR. THIS PIPING IS NOT SHOWN ON APPROVED PLAN AND WOULD REQUIRE A MINIMUM 1" YARD LINE IF LEFT IN PLACE. FLEX CONNECTOR AT FURNACE CANNOT PASS THRU APPLIANCE HOUSING |