Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/24/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/23/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) BASED ON YOUR PLAN, 1/2" PIPE TO WATER HEATER AND FURNACE IS UNDERSIZED (AT FARTHEST UNIT) 2) AT REAR UNIT, PIPE MAY NOT BE RUN ALONG THE FINISH GRADE BUT MUST BE KEPT AT LEAST 6" ABOVE GRADE. FLEX TO DRYER IS UNDERSIZED 3) 1/2" PIPE TO FURNACE AND WATER HEATER IS UNDERSIZED 4) COMPLETE ALL ROUGH PIPING 5) THIS IS A DUPLEX-PLAN ONLY SHOWS ONE FURNACE AND ONE RANGE. INCLUDE ALL APPLIANCE BTU'S AND TOTAL DEVELOPED LENGTH, NO JUST THE MAIN 6) NO RESPONSE AT EITHER UNIT |