Inspection History Details
Inspection Status: Cancelled
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/31/2009 | PLUMBING - FINAL | Cancelled | IVRS - RI canceled | |
| 08/28/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/21/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) EXPOSED WATER PIPING IS REQUIRED TO BE INSULATED PROPERLY TO RESIST FREEZING 2) PROVIDE BONDING OF BLDG GAS PIPING 3) PROVIDE PIPE PRIMER THEN TAPE ALL TOOL MARKS AND FITTING TO 6" ABOVE GRADE ON UNDERGROUND GAS PIPING 4) NEW WATER HEATER REQUIRES A TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING THAT IS APPROVED MATERIAL GRAVITY DRAIN TO DAYLIGHT TERMINATE 90 DEGREE DOWN 5) VENT FROM WATER HEATER SHALL RISE MINIMUM 1/4" PER FOOT AND TIE INTO AN APPROVED WYE FITTING AT DBL WALL VENT THRU CEILING 6) PROVIDE SEDIMENT TRAP AT GAS ENTRY TO NEW WATER HEATER 7) PROVIDE APPROVED WATER FITTINGS AT HOT OUTLET PIPING OF WATER HEATER 8) PROPERLY SEAL HOLE IN FLOOR STRUCTURE OF FURNACE/WATER HEATER RETURN AIR PLENIUM |