Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/11/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) TEST TO HOLD FOR 15 MINUTES WITH NO LOSS OF PRESSURE 2) ROOF TOP PIPING TO BE SUPPORTED AT CORRECT INTERVALS WITH WEATHER PROOF SUPPORS AND SECURE TO SUPPORTS 3) PROVIDE ROOF JACKS, PROPERLY WEATHER SEALED AT PIPE PENETRATIONS THRU ROOF 4) TEST TO BE ON ENTIRE GAS SYSTEM (OPEN VALVE THAT IS IN LINE AT WATER HEATER AREA) 5) PROVIDE APPROVED VENT FOR WATER HEATER, MADE UP CORRECTLY WITH FASTENERS AT VENT JOINTS 6) PROVIDE APPROVED GAS SHUT OFF VALVES AT ALL APPLIANCES 7) PROVIDE MINIMUM REQUIRED COMBUSTION AIR FOR WATER HEATER (UPPER) 8) PROVIDE PIPE PRIMER AND THEN TAPE TOOL MARKS AND FITTING UNDERGROUND |