Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/13/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/12/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 1:05-CALLED AND LEFT MESSAGE OF ARRIVAL AT 11:30 FOR 1:00. NO ACCESS 2) PLEASE HAVE AN ADULT PRESENT TO PROVIDE ACCESS FOR REINSPECTION |
|
| 08/07/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) TEST TO BE ON ENTIRE SYSTEM AND HOLD WITH NO LESS OF PRESSURE FOR 15 MINUTES 2) ALL TOOL MARKS ON UNDERGROUND PIPING NEEDS TO BE PRIMED AND TAPED PER NOTE #3 ABOVE 3) WATER HEATER TEMPERATURE AND PRESSURE RELIEF DEVICE IS NOT FUNCTIONAL NEED REPLACEMENT AND DRAIN PIPING NEED TO GRAVITY DRAIN TO DAY LIGHT WITH APPROVED PIPING (NO FLEX) 4) NOTE: UNLESS YOU TIE IN THE SEPERATE 1 1/4" PIPE THAT APPREARS TO GO TO THE POOL HEATER, IT CANNOT BE CONNECTED BY S.W. GAS |
|
| 08/05/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 15 PSI TEST 2) REMOVE UNIONS FROM TRENCH AND USE APPROVED COUPLINGS 3) ALL FITTINGS IN THE TRENCH MUST BE PRIMED WITH TAPE PRIMER AND WRAPPED WITH 40 MILS OF TAPE 4) RESET SYSTEM |