Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2009 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* 1) SECURE GAS PIPING AT STOVE |
|
| 08/21/2009 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NO ONE HOME |
|
| 08/18/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) NO ANSWER 2:10 PM 2) YARD LINE IS OK TO COVER 3) PROVIDE ACCESS TO GAS SYSTEM 4) WATER HEATER REQUIRES THE FOLLOWING CORRECTIONS 5) TYPE B VENT IS REQUIRED OUTSIDE OF ENCLOSURE 6) SECURE ENCLOSURE 7) TERMINATE T & P 6" ABOVE GRADE 8) T & P SHALL BE OPERATIONAL |