Inspection History Details
Inspection Status: Partial Approval
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/13/2009 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1) PLUMB AND SECURE VENT CONNECTOR AND DRAFT COLLAR. MAKE SURE ALL SCREWS PENETRATE BOTH PIECES AND ALL JOINTS. ALL HOLES SHALL BE FILLED WITH SCREWS 2) T & P TERMINATION SHALL BE WITHOUT THREADS 3) RECALL FOR INSPECTION 4) GAS CLEARANCE PROVIDED |
|
| 07/10/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NOT A REPAIR. PROVIDE A PLAN FOR GAS REPIPE 2) PROVIDE CORRECT T & P TERMINATION, SECURE VENT CONNECTOR WITH GALV. SHEET METAL SCREWS AND CORRECT SLOPE OF VENT CONNECTOR AT NEW WATER HEATER 3) PROVIDE ACCESS TO ROOF 4) SECURE GAS PIPE DROP TO STOVE (WHICH IS SUPPORTING FENCE) AND SEAL WALL PENETRATIONS |