Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/30/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) TEST TO HOLD WITH NO LOSS OF PRESSURE 2) PROVIDE APPROVED GLUE FOR CPVC INSTALLATION 3) TEMPERATURE AND PRESSURE RELIEF SHALL BE FUNCTIONAL 4) BLDG SERVICE VALVE TO BE AGA OR CSA APPROVED, GAS VALVE AND STOVE 5) SUPPORT T & P DRAIN PIPING |
|
| 06/29/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SEE ALL NOTES |
|
| 06/26/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE MINIMUM 10 PSI TEST ON ENTIRE GAS SYSTEM 2) PROVIDE PIPE PRIMER THEN TAPE TO ACHIEVE 40 MIL THICKNESS OF PIPE WRAP ON ALL TOOL MARKS AND FITTING BELOW GRADE TO 6" ABOVE GRADE 3) PROVIDE APPROVED GAS SHUT OFF VALVES AT BLDG ENTRY AND ALL APPLIANCES 4) PROVIDE FUNCTIONAL TEMPERATURE AND PRESSURE RELIEF WITH APPROVED FULL SIZE DRAIN PIPING GRAVITY DRAIN TO DAY LIGHT TERMINATING AT 90 DEGREE DOWN 6" TO 24" FROM FINISH GRADE 5) VENT FROM FURNACE TO BE INSTALLED CORRECTLY WITH FASTENERS AT ALL JOINTS, DBL WALL THRU CEILING AND ROOF TERMINATING AT APPROVED VENT CAP MINIMUM OF 3' ABOVE TOP OF COOLER INTAKE. NOTE: LARGEST BTU DEVICE SHALL VENT THRU WITH SMALLER BTU DEVICE TIED INTO AS BRANCH VENT 6) PROVIDE BONDING OF BLDG GAS PIPING SYSTEM 7) PROVIDE SEDIMENT TRAPS AT GAS ENTRY TO FURNACE/WATER HEATER |