Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2009 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 06/26/2009 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE ACCESS TO ENTIRE GAS PIPING SYSTEM 2) TEST TO BE ON ENTIRE GAS PIPING SYSTEM (OPEN VALVE AT BLDG AND TEST TO APPLIANCE SHUT OFF VALVES). LIST IS NOT COMPLETE (REINSPECTION) 4) PROVIDE APPROVED GAS SHUT OFF VALVES AT ALL APPLIANCES 5) PROVIDE APPROVED VENT THRU ROOF WITH VENT CAP FOR WATER HEATER (DBL WALL THRU CEILING AND ROOF). PROVIDE FASTENERS AT VENT JOINTS 6) PROVIDE SUPPORTS FOR ROOF TOP PIPING UP OFF OF ROOF 7) GAS VALVE FOR ROOF TOP UNIT TO BE WITHIN 6' OF GAS ENTRY TO UNIT |