Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/11/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE INSPECTION HISTORY FOR ALL REMODELED WORK I.E - NEW GAS PIPING, NEW WATER HEATER, WATER LINE REPIPE 2. GAS PRESSURE TEST OK SOME REJECTIONS INCLUDE BUT NOT LIMITED TO: 1. NO T&P RELIEF AT WATER HEATER 2. NO BOND BETWEEN WATER AND GAS 3. NO SCREWS ON VENT CONNECTOR 4. NO DRIP LEG AT WATER HEATER GAS CONNECTION 5. THREE MECHANICAL VENTS WITHIN TEN FEET OF COOLER INTAKE 6. EXTERIOR PENETRATIONS NOT SEALED 7. NO HAMMER ARRESTORS AT WASHER CONNECTION |