Inspection Status: Partial Approval
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/15/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* TEST FROM METER TO WATER HEATER AND 3/4" VALVED STUB UP AT BUILDING APP. 4' (PARTIAL APPROVAL) PROVIDE PROOF OF INSPECTION OR PROVIDE PERMIT WITH INSPECTION FOR NEW ROOF TOP UNIT AND DUCT SYSTEM FOR BUILDING. COMPLETE GAS PIPING TO ROOF TOP UNIT THAT IS ON ROOF SHOWN AS FUTURE ON CITY APPROVED PLAN. EXPOSE WATER CONNECTION TO EXISTING IT SHOULD BE 3/4 TO WATER HEATER AND SUPPLY BACK TO FIXTURES. YOU HAVE AN UNSANITARY, ILLEGALLY INSTALLED WASHER CONNECTION AND KITCHEN SINK DRAIN. WHERE IS THE OLD WATER HEATER LOCATION? PROVIDE PROOF OF NEW ELECTRICAL CIRCUITS INSTALLATION IN UNAPPROVED EXTERIOR CONDUIT. |
|
| 06/10/2009 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. EXPOSE ALL NEW PIPING FOR INSPECTION 2. TEST GAS SYSTEM IN ITS ENTIRETY 3. TEST ALL PIPING TO POINT OF CONNECTION OK TO APPLIANCE SHUT OFF VALVE 4. REMOVE FUTURE TEE CONNECTION AT WATER HEATER AREA GAS PIPING OR PROVIDE REVISED CITY APPROVED PLAN SHOWING FUTURE CONNECTION 5. PROVIDE ACCESS TO INTERIOR FOR WATER HEATER WATER PIPING - NOTE: TYPICALLY A WATER HEATER IS SUPPLIED WITH 3/4" PIPING 6. WATER PIPING EXPOSED TO FREEZING REQUIRES INSULATION 7. PROVIDE VALVES APPROVED FOR USE WITH GAS PIPING 8. VALVE ON WATER PIPING AT WATER HEATER GO BEFORE WATER FLEX TO HEATER 9. TEMPERATURE AND PRESSURE RELIEF REQUIRES DRAIN PIPING TERMINATING 6" TO 24" FROM FINISH GRADE LIST NOT COMPLETE |