Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T09PL00944

Parcel: 138140580

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
06/12/2009 PLUMBING - FINAL Approved IVRS - Inspection :*
06/05/2009 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. VENT FROM FURNACE TO HAVE APPROVED FASTENERS AT ALL JOINTS OF VENT PIPING.
2. VENT PIPING MUST BE CORRECTLY SIZED & IN WORKING ORDER.
3. REMOVE ALL TAPE FROM ALL VENT PIPING AND PROVIDE FASTENERS ON WATER HEATER PIPING.
4. WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN PIPING TO BE FULL SIZE APPROVED MATERIAL GRAVITY DRAIN TO DAYLIGHT.
5. ARRANGE GAS VALVE FOR WATER HEATER TO PROVIDE WATER HEATER PULL SPACE FOR REMOVAL OF WATER HEATER.
6. PROVIDED DRIP LEGS AT WATER HEATER AND FURNACE GAS ENTRY TO APPLIANCE
7. WATER HEATER VENT TO BE DOUBLE WALL THRU ROOF TO TERMINATION MINIMUM 3' ABOVE COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE
8. FURNACE VENT TO BE DOUBLE WALL THRU ROOF TO TERMINATION 3' ABOVE COOLER INTAKE WHEN WITHIN 10' OF COOLER
9. PROVIDE BONDING OF BUILDING GAS PIPING