Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/09/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/03/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE A PLUG OR CAP AT STOVE AREA ON UNUSED GAS FOR STOVE 2) PROVIDE SUPPORT FOR GAS PIPING AT FURNACE VALVE LOCATION 3) PROVIDE 1" AIR GAP AT T & P TERMINATION AND DRIP PAN LIP 4) PROVIDE AN ADDITIONAL SUPPORT AT ROOF TOP PIPING 5) TERMINATE 125 POUND PRESSURE RELIEF TO EXTERIOR OF STRUCTURE |